Range of SwingGate OperatorsLatest Revision: 16.11.2006Document Ref. No. 1150.D.01.0008_17Product Code: CP73R5INSTALLATIONMANUAL

Seite 2

SPECIFICATION (continued)The actual components supplied may vary depending on the model purchased.Product IdentificationProduct IdentificationFigure 2

Seite 3

SPECIFICATION (continued)The actual components supplied may vary depending on the model purchased.Product IdentificationProduct IdentificationFigure 2

Seite 4 - WARNINGS FOR THE INSTALLER

Required Tools & EquipmentRequired Tools & EquipmentMasonry Bits - 6mm20mm For Wall Mount BracketSteel Bits 8,5mm/5,0mm/4,0mmSpanners22mm17mm1

Seite 5

Required Tools & EquipmentRequired Tools & EquipmentMasonry Bits - 6mm20mm For Wall Mount BracketSteel Bits 8,5mm/5,0mm/4,0mmSpanners22mm17mm1

Seite 6 - Fast TrackFast Track

Cabling RequirementsCabling RequirementsPage 142 1. 220V AC mains cable via mains isolator 4. Radio receiver cable (3 core 0,5mm2switch (3 core LNE 0,

Seite 7

Cabling RequirementsCabling RequirementsPage 142 1. 220V AC mains cable via mains isolator 4. Radio receiver cable (3 core 0,5mm2switch (3 core LNE 0,

Seite 8 - Specifications

01 07981 5101Figure 7 Pedestal Positioning for Standard Installationso110o120o100o90o80o70o60Gate opening angleo0β#A BC EGate OpeningAngle (Degrees)60

Seite 9

01097815011Figure 7 Pedestal Positioning for Standard Installationso110o120o100o90o80o70o60Gate opening angleo0β#A BC EGate OpeningAngle (Degrees)60 2

Seite 10 - Figure 2 Linkage Hardware Kit

PEDESTAL POSITIONING FOR OUTWARD OPENING GATESβ#A BCGate OpeningAngle (Degrees)100 to 400 (120)100 to 400 (120)100 to 380 (120)100 to 260 (120)520 to

Seite 11

PEDESTAL POSITIONING FOR OUTWARD OPENING GATESβ#A BCGate OpeningAngle (Degrees)100 to 400 (120)100 to 400 (120)100 to 380 (120)100 to 260 (120)520 to

Seite 12 - 3.5mm Flat

Page 2Centurion Systems (Pty) Ltd. reserves the right to make changes to the products described in this manual without notice and without obligation o

Seite 13

Figure 11 Determining Wall Bracket Position for Parallel Wall MountFOR INSTALLATIONS WHEREOTHE GATE OPENS LESS THAN 90FOR INSTALLATIONS WHERE THEOGATE

Seite 14 - Locate the Operator Position

Figure 11 Determining Wall Bracket Position for Parallel Wall MountFOR INSTALLATIONS WHEREOTHE GATE OPENS LESS THAN 90FOR INSTALLATIONS WHERE THEOGATE

Seite 15

2. Determine a suitable position for the pedestal or wall mount bracket using the swing angle and dimensions A and B as found in the tables in Fig 7 t

Seite 16 - STANDARD INSTALLATION

2. Determine a suitable position for the pedestal or wall mount bracket using the swing angle and dimensions A and B as found in the tables in Fig 7 t

Seite 17

Figure 15 Determining Drive Arm Length for Standard Pedestal & Outward Opening GatesIf L = 934 and S = 333then D = 934 - 333therefore D (driv

Seite 18 - PERPENDICULAR WALL MOUNT

Figure 15 Determining Drive Arm Length for Standard Pedestal & Outward Opening GatesIf L = 934 and S = 333then D = 934 - 333therefore D (driv

Seite 19

Page 26Connecting ArmClose gate toextend theconnecting armNB. Hinge pointsmust be in a straightline when gates are closedDrive ArmDrive ArmClampGate c

Seite 20 - Wall Bracket

Page 26Connecting ArmClose gate toextend theconnecting armNB. Hinge pointsmust be in a straightline when gates are closedDrive ArmDrive ArmClampGate c

Seite 21

8. Repeat the procedure for the other motor in a double swing system.9. Return the origin tool to its storage position on the upright pillar and close

Seite 22 - Determine Drive Arm Length

8. Repeat the procedure for the other motor in a double swing system.9. Return the origin tool to its storage position on the upright pillar and close

Seite 23

Page 2Centurion Systems (Pty) Ltd. reserves the right to make changes to the products described in this manual without notice and without obligation o

Seite 24 - D = L - S

23. If no additional Features are required, then exit programming mode by removing the SET link. Store the link by pushing it over ONE of the two pin

Seite 25

23. If no additional Features are required, then exit programming mode by removing the SET link. Store the link by pushing it over ONE of the two pin

Seite 26 - NB. Hinge points

L2 will come back on, indicating that the STATUS has been updated.34. To set the COUNT value of the Auto-close timer, Pedestrian Auto-close time, Cour

Seite 27

L2 will come back on, indicating that the STATUS has been updated.34. To set the COUNT value of the Auto-close timer, Pedestrian Auto-close time, Cour

Seite 28 - Mechanism

Page 34• When the PED input is triggered the pillar light flashes for an adjustable (1 to 255 seconds) pre-flash time (FEATURE 11 - COUNT) before t

Seite 29

Page 34• When the PED input is triggered the pillar light flashes for an adjustable (1 to 255 seconds) pre-flash time (FEATURE 11 - COUNT) before t

Seite 30 - (Optional)

Page 36Set-up Troubleshooting Guide Continued...17 (continued)Motor briefly starts and then stops, and STATUS flashes 5 times.Motor starts then stops

Seite 31

Page 36Set-up Troubleshooting Guide Continued...17 (continued)Motor briefly starts and then stops, and STATUS flashes 5 times.Motor starts then stops

Seite 32 - Controller Features

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEM2Gate does not move, but the relays “click” when the unit is activated:Page 38Fault Finding Guid

Seite 33

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEM2Gate does not move, but the relays “click” when the unit is activated:Page 38Fault Finding Guid

Seite 34 - Leaf Delay:

Declaration of ConformityDeclaration of ConformityPage 4Manufacturer: Centurion Systems (Pty) Ltd148 Epsom RoadNorth RidingGautengSouth AfricaDeclares

Seite 35

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEMPage 40Fault Finding Guide Continued...89101112Gate opens to pedestrianand closesGate takes a fe

Seite 36 - (continued)

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEMPage 40Fault Finding Guide Continued...89101112Gate opens to pedestrianand closesGate takes a fe

Seite 37

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEMPage 42Fault Finding Guide Continued...BFalse Collision Detection(STATUS light could flash4 time

Seite 38

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEMPage 42Fault Finding Guide Continued...BFalse Collision Detection(STATUS light could flash4 time

Seite 39

Use this procedure to accurately determine the gate opening angle:Page 44Determine Gate Swing AngleDetermine Gate Swing Angle1 351mm1 474mm1 587mm1 68

Seite 40

Use this procedure to accurately determine the gate opening angle:Page 44Determine Gate Swing AngleDetermine Gate Swing Angle1 351mm1 474mm1 587mm1 68

Seite 41

NAMECOLOUR ON OFF REMARKSTable 1 LED Indicator Light Description & PurposePage 46LED Indicator LightsLED Indicator LightsThe controller is fitted

Seite 42 - Normal Operation

NAMECOLOUR ON OFF REMARKSTable 1 LED Indicator Light Description & PurposePage 46LED Indicator LightsLED Indicator LightsThe controller is fitted

Seite 43

MCP84ER5V0121 43LNENEUTRALNEUTRALLIVELIVEAUXILIARYSUPPLY220V ACMAINS IN6-WAYCONNECTOR3-WAYCONNECTOR3-WAYCONNECTORRED / BLACK / PURPLERED / BLACK / ORA

Seite 44

MCP84ER5V0121 43LNENEUTRALNEUTRALLIVELIVEAUXILIARYSUPPLY220V ACMAINS IN6-WAYCONNECTOR3-WAYCONNECTOR3-WAYCONNECTORRED / BLACK / PURPLERED / BLACK / ORA

Seite 45

Declaration of ConformityDeclaration of ConformityPage 4Manufacturer: Centurion Systems (Pty) Ltd148 Epsom RoadNorth RidingGautengSouth AfricaDeclares

Seite 46 - During Programming Mode

Page 50CP84ER5V01 Charger ConnectionCP84ER5V01 Charger ConnectionPSUx Power ConnectionPSUx Power ConnectionBATT -BATT +LNE4SLAVESLAVEMASTERMASTERBATT

Seite 47

Page 50CP84ER5V01 Charger ConnectionCP84ER5V01 Charger ConnectionPSUx Power ConnectionPSUx Power ConnectionBATT -BATT +LNE4SLAVESLAVEMASTERMASTERBATT

Seite 48 - RADIO RECEIVER

Page 52Installation DetailsInstallation Date:Installer's Name:Installer's Address:Installation Checked By:Installer's Telephone Number:

Seite 49

Page 52Installation DetailsInstallation Date:Installer's Name:Installer's Address:Installation Checked By:Installer's Telephone Number:

Seite 50

Page 54 Page 55

Seite 51

Page 54 Page 55

Seite 52 - Installation Details

CENTURIONTHE AUTOMATIC CHOICE CENTURION SYSTEMS (PTY) LTD HEAD OFFICE:TEL: +27 (0)11 699-2400, FAX: +27 (0)11 704-3412 or 462-6669 148 EPSOM AVENUE, N

Seite 53

These abbreviated instructions are for the experienced installer who needs a checklist to get a standard installation up and running in the minimum of

Seite 54 - Page 54 Page 55

These abbreviated instructions are for the experienced installer who needs a checklist to get a standard installation up and running in the minimum of

Seite 55

The R3 & R5 rotary swing gate systems are designed to open and close swing gates. The CP75 controller is capable of handling both single and doub

Seite 56 - CENTURION

The R3 & R5 rotary swing gate systems are designed to open and close swing gates. The CP75 controller is capable of handling both single and doub

Kommentare zu diesen Handbüchern

Keine Kommentare