Centurion R3 Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Toröffner Centurion R3 herunter. Centurion R3 Installation manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - OPERATOR

TMR3 and R5 installation manualTMROTARY SWING GATE OPERATOR

Seite 2

SPECIFICATION (continued)The actual components supplied may vary depending on the model purchased.Product IdentificationProduct IdentificationProduct

Seite 3

Figure 3 Product IdentificationPage 111. Baseplate2.* Battery (7 A/H)3. Geared DC Motor4.* Master Controller (CP75)5. Slave Interface Card (CP75B

Seite 4

Required Tools & EquipmentRequired Tools & EquipmentRequired Tools & EquipmentMasonry Bits - 6mm20mm For Wall Mount BracketSteel Bits 8,5m

Seite 5 - WARNINGS FOR THE INSTALLER

Install the gate operator only if:1. It will not pose a hazard to the public.2. There is sufficient clearance to a roadway and/or public thoroughfar

Seite 6 - Mechanical Setup

Cabling RequirementsCabling RequirementsCabling RequirementsPage 141. 220V AC mains cable via mains isolator 2switch (3 core LNE 0,5mm )*†, Or Low

Seite 7 - Electrical Setup

Pedestal Mount FeaturesSecure locking with no need for gate end stops.Can be used on both inward and outward opening gates and on installatio

Seite 8 - Specifications

10079158110Figure 7 Pedestal Positioning for Standard Installationso110o120o100o90o80o70o60Gate opening angleo0b#A BC EGate OpeningAngle (Degrees)60 2

Seite 9 - *Other voltages are available

PEDESTAL POSITIONING FORINSTALLATIONS WITH LIMITED SPACEb#A BC D E FGate OpeningAngle (Degrees)170 to 360 (170)210 to 400 (210)250 to 440 (250)280 to

Seite 10 - Figure 2 Linkage Hardware Kit

PEDESTAL POSITIONING FOR OUTWARD OPENING GATESb#ABCGate OpeningAngle (Degrees)100 to 400 (120)100 to 400 (120)100 to 380 (120)100 to 260 (120)520 to 6

Seite 11

Figure 10 Determining Wall Bracket Position for Perpendicular Wall MountPERPENDICULAR WALL MOUNT FOR INSTALLATIONS WHEREO THE GATE OPENS 90 OR LESSFOR

Seite 12 - 3.5mm Flat

Page 2Centurion Systems (Pty) Ltd. reserves the right to make changes to the products described in this manual without notice and without obligation o

Seite 13

Figure 11 Determining Wall Bracket Position for Parallel Wall MountFOR INSTALLATIONS WHEREOTHE GATE OPENS LESS THAN 90FOR INSTALLATIONS WHERE THEOGATE

Seite 14

Figure 12 Determine the Position of the Gate Bracket and Pedestal or Wall BracketGATE BRACKET LOCATION & PEDESTALHEIGHT FOR PEDESTAL MOUNT INSTALL

Seite 15 - Locate the Operator Position

2. Determine a suitable position for the pedestal or wall mount bracket using the swing angle and dimensions A and B as found in the tables in Fig 7

Seite 16 - PEDESTAL POSITIONING FOR

8. Securely concrete the pedestal into position making sure that it is vertical, and at the correct height relative to the gate bracket, as shown in

Seite 17

Figure 15 Determining Drive Arm Length for Standard Pedestal & Outward Opening GatesIf L = 934 and S = 333then D = 934 - 333therefore D (driv

Seite 18 - FOR THIS INSTALLATION TYPE

until the ski-pole lock starts to tighten. Do not over tighten, as that will make the final adjustment more difficult.14. Open the gate, and

Seite 19 - INSTALLATION TYPE

Page 26Connecting ArmClose gate toextend theconnecting armNB. Hinge pointsmust be in a straightline when gates are closedDrive ArmDrive ArmClampGate c

Seite 20 - BE SURE TO USE A ‘SHORT’

Electrical Set-upElectrical Set-upElectrical Set-upConnect all wiring1. Connect all cables as required to the control card and battery char

Seite 21 - Wall Bracket

8. Repeat the procedure for the other motor in a double swing system.9. Return the origin tool to its storage position on the upright pillar and clo

Seite 22 - Mount Gate Bracket

Select either Master orSlave motor setup (The gate limits of the Master and Slave motors are set independently of each other.) 15. Pre

Seite 23 - Determine Drive Arm Length

Table of ContentsTable of ContentsTable of ContentsDeclaration of Conformity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Seite 24 - Set the Connecting Arm

23. If no additional Features are required, then exit programming mode by removing the SET link. Store the link by pushing it over ONE of the two pi

Seite 25 - Clevis Pin

Page 31 (See Set-up Troubleshooting Guide step 14 or 29)Selecting the Feature to Change(This is the first of two steps in setting a Feature. Thi

Seite 26 - NB. Hinge points

L2 will come back on, indicating that the STATUS has been updated.34. To set the COUNT value of the Auto-close timer, Pedestrian Auto-close time, Cou

Seite 27 - Power Source Link

Page 33impulse while the gate is still moving will stop the gate. A third impulse will cause the gate to reverse its direction of travel, i.e. the act

Seite 28 - Mechanism

Page 34• When the PED input is triggered the pillar light flashes for an adjustable (1 to 255 seconds) pre-flash time (FEATURE 11 - COUNT) before

Seite 29 - Set the gate limits

Page 35Set-up Troubleshooting GuideSet-up Troubleshooting GuideSet-up Troubleshooting GuideSET-UP STEP PROBLEM POSSIBLE CAUSES & SOLUTIONS TO

Seite 30 - (Optional)

Page 36Set-up Troubleshooting Guide Continued...17 (continued)Motor briefly starts and then stops, and STATUS flashes 5 times.Motor starts then stops

Seite 31

Set-up Troubleshooting Guide Continued...Page 3724 (continued)Fault Finding GuideFault Finding GuideFault Finding Guide PROBLEM POSSIBLE CAUSES &a

Seite 32 - Controller Features

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEM2Gate does not move, but the relays “click” when the unit is activated:Page 38Fault Finding Gui

Seite 33 - Courtesy (Pillar) Light:

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEMPage 39Fault Finding Guide Continued...567Gate overruns its limits:Gate opens on its ownUnrelia

Seite 34 - Leaf Delay:

Declaration of ConformityDeclaration of ConformityDeclaration of ConformityPage 4Manufacturer: Centurion Systems (Pty) Ltd Unit 13 Northlands Pro

Seite 35

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEMPage 40Fault Finding Guide Continued...89101112Gate opens to pedestrianand closesGate takes a f

Seite 36 - (continued)

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEMPage 41Fault Finding Guide Continued...ALow Battery Voltage Condition(STATUS light flashes 3 ti

Seite 37

PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEMPage 42Fault Finding Guide Continued...BFalse Collision Detection(STATUS light could flash4 tim

Seite 38

The manual release mechanism is used to disengage the output shaft from the motor, thus making it possible to open or close the gates manually without

Seite 39

Use this procedure to accurately determine the gate opening angle:Page 44Determine Gate Swing AngleDetermine Gate Swing AngleDetermine Gate Swing Angl

Seite 40

Page 45Description of Terminal FunctionsDescription of Terminal FunctionsDescription of Terminal FunctionsMASTER The master motor is connected to the

Seite 41

NAMECOLOUR ON OFF REMARKSTable 1 LED Indicator Light Description & PurposePage 46LED Indicator LightsLED Indicator LightsLED Indicator LightsThe c

Seite 42

FEATUREDESCRIPTIONAuto-closeAuto-close TimeGate Limit Settings-See detailed instructions on page 29123STATUS or COUNTDESCRIPTION-ON15 seconds (Defaul

Seite 43 - Normal Operation

MCP84ER5V0121 43LNENEUTRALLIVEAUXILIARYSUPPLY220V ACMAINS IN6-WAYCONNECTOR3-WAYCONNECTOR3-WAYCONNECTORRED / BLACK / PURPLERED / BLACK / ORANGETO ORIGI

Seite 44

NEG NEG NEG+12V+12V/24V+12V/24VSOLENOIDLOCKPUSHBUTTONFOR SWITCHINGPILLAR LIGHT (N/0)HOLIDAYLOCKOUTSWITCH(N/C)STATUS LEDPEDESTRIANKEYSWITCH (N/O)(RETUR

Seite 45

Important Safety InstructionsImportant Safety InstructionsImportant Safety InstructionsTo ensure the safety of people, it is important that you read a

Seite 46 - During Programming Mode

Page 50CP84ER5V01 Charger ConnectionCP84ER5V01 Charger ConnectionCP84ER5V01 Charger ConnectionPSUx Power ConnectionPSUx Power ConnectionPSUx Power Con

Seite 47 - STATUS or COUNT

Page 51Installation HandoverInstallation HandoverInstallation HandoverOnce the installation has been successfully completed and tested, it i

Seite 48

Page 52Installation DetailsInstallation Date:Installer's Name:Installer's Address:Installation Checked By:Installer's Telephone Number:

Seite 50

Page 54

Seite 51

Page 55

Seite 52 - Installation Details

0.07.A.0058_22072013www.centsys.comSharecall 0860-CENTURION (0860 236 887)Head Office: +27 11 699 2400Sharecall Technical Support 0861 003 123 or +27

Seite 53

These abbreviated instructions are for the experienced installer who needs a checklist to get a standard installation up and running in the minimum of

Seite 54

Read and understand all safety instructions Page 5 Connect all wiring: Page 27 Set the gate origin: Page 27 Release the manual override and

Seite 55

The R3 & R5 rotary swing gate systems are designed to open and close swing gates. The CP75 controller is capable of handling both single and doub

Seite 56 - 0.07.A.0058_22072013

SPECIFICATION R3 R5Input Voltage* 220V AC ±10% 50Hz 220V AC ±10% 50HzAC Current draw (with C84E Battery Charger) 120mA 120mADC Motor Voltage 12

Kommentare zu diesen Handbüchern

Keine Kommentare